Why are the problems of urban central heating and heat preservation pipeline network continuing?
0
Publisher: admin  Publishing time: 2018-11-14 Hits: 1624 times
Every year in the heating season, the phenomenon of leakage and leakage of insulation pipeline has become common for heating enterprises, and bursting phenomenon also occurs from time to time. According to the relevant personnel, some insulation pipelines need daily water replenishment, while 2/3 of the water replenishment is leaky, and a small number of users steal water. Leak...

Every year in the heating season, the phenomenon of leakage and leakage of insulation pipeline has become common for heating enterprises, and bursting phenomenon also occurs from time to time. According to the relevant personnel, some insulation pipelines need daily water replenishment, while 2/3 of the water replenishment is leaky, and a small number of users steal water. Leakage is almost a common problem in the national heating industry. Hot water runs away, but cold water is added later. Leakage runs out of heat energy, which increases the operating cost of heating enterprises. Among them, the overtime operation of pipeline is the main reason for bursting and leakage of pipeline network. Most of the service life of some main networks is more than 20 years, some even up to 35 years. This part of the pipeline network is aging and corroded seriously.
So, since the pipeline network is aging, why not replace it? In many parts of China, the construction of pipeline network is priced by the government. If the price is inversely linked to the cost, or the space between the two is very small, the heating enterprises will certainly not be able to invest one-time funds to replace the insulation pipeline network, and can only change part of it in an emergency way year by year.
In recent years, energy saving and emission reduction have been vigorously implemented, many small coal-fired boilers have been eliminated, and heating enterprises need to take over the heating areas they originally assumed. Most of the inherited districts are old districts, and the heat enterprises are responsible for the transformation of the pipeline network. The construction fees are impossible to collect, which brings a heavy burden to the heating enterprises. In principle, real estate developers are responsible for the construction of secondary heating pipeline network in each residential area, but in the process of construction, some developers in order to maximize profits, have reduced the cost to the greatest extent, thereby reducing the quality of the project. The pipeline network constructed by the developer is not tightly closed by valves, the joints of the pipeline network are not insulated, and the welding quality is not qualified, so the heating enterprises need to invest again in the transformation of the insulation pipeline network.
More than a decade ago, experts from the Ministry of National Construction studied the cost and profit point of heating. At that time, they believed that heating enterprises entering the market should give certain profit margin, so as to be conducive to its sustainable development. Heating industry is a public welfare industry and a people's livelihood project. It can not be pushed to the market without being ignored. Costs have not been recovered, and they are facing such and such financial burdens. How can heating enterprises develop power? So when we study this industry, we should hold the attitude of scientific development, rationally study industrial policies, scientifically and reasonably determine the heat price, and give enterprises a certain profit space, so that the heating industry can have stamina, sustainable development and ensure people's livelihood.
At present, the heating mode of many heating enterprises is still extensive. If the heating standard is raised again, it will inevitably result in energy waste. Therefore, if we want to raise the temperature, we must first realize intelligent heating, that is to say, to achieve the precise control of heating temperature. If the precise control can not be achieved, the temperature will increase, there will be more housing. Opening windows for winter is a huge waste of energy. There is also a person in charge of a thermal enterprise said that under the current pipe network conditions, the rise of temperature will certainly cause serious phenomenon of leakage or even burst of insulation pipeline due to the insufficient carrying capacity of the pipe network.
Most regrettably, the development history of central heating in China has been more than 30 years, but there are still no national laws and regulations on heating management. In the National Industry Standard "Energy-saving Design Standard for Residential Buildings in Cold and Cold Areas", apart from the explicit stipulation that "the calculating temperature of heating room in winter should be 18 C", it also requires that "residential buildings in cold and cold areas must adopt energy-saving design. On the premise of guaranteeing the quality of indoor thermal environment, building thermal and heating design should include: Heating energy consumption should be controlled within the prescribed range.

Survey & dynamic
Company Profile
Corporate Culture
Honor Certificate
Company News
Industry Dynamics
 
Product Display
Polyurethane Thermal Insulation Pipe
Steel Casing Steel Steam Pipe
PE Outer Sheath
Thermal Insulation Pipe Fittings
Engineering & Technology
Case Show
Project Performance
Production Equipment
Test Equipment
Contact Information
Copyright 2019 All Rights Reseved 
Hebei Baoli Thermal Pipeline Engineering Co., Ltd.
Monday to Sunday 07:00 - 20:00
400-0316-266